54MWh customer-side energy storage project in Jiangsu

Project Overview

This is an energy storage project with a capacity of 54MWh installed in a large industrial customer's facility in Jiangsu. The project includes a 110kV dedicated substation for the customer, with a total transformer capacity of over 60,000KVA. The energy storage system consists of 20 sets of 2.7MWh containerized batteries, with a total investment of approximately 89 million yuan. The project is connected to the grid at 10kV, and the peak-valley price differential is the main source of benefits. Since its operation in 2020, there have been no safety accidents and it has been running stably and reliably.

project achievement

The first user-side energy storage project in Jiangsu with a single unit exceeding 50 MWh. 

Customized energy storage system integration design according to customer requirements, with delivery speed leading the industry.